Ⅰ.Project description:
The important national constructions of the “three Gorges Project” and the natural gas in the west area transported to the east bring opportunity for the power industry. Baosheng Group loses no time and has developed 110KV high voltage cross-linked cables. Now the demand for the product exceeds supply and the product has a bright future, but the joints products that go with the 110KV and 220KV high-voltage cross-linked cables are mainly imported. To meet the demand of the development of the power market, the Group is looking for cooperation to import advanced production line of joint and develop series of high voltage cable joint products. After its implementation, the sales will be $ 5 million.
Ⅱ.Brief introduction of the undertaking:
Baosheng Group
Ⅲ.Investment estimate:
Total investment: $ 2 million
Equipment: $ 1.45 million
Factory buildings and others: $ 0.55 million
Ⅳ.Cooperation form:
Joint venture, cooperation
Ⅴ.Construction period: 1 year
Investment payoff period: 3 years
|